Reporting on your River or Broad this weekend?

Planet Patrol is asking people to head to their local waterways for about 15 minutes around the 14th, 15th, and 16th of October 2022 to report on their condition. It is part of the Planet Patrol Autumn Water Watch programme.

How clean is the water you swing over?

“Water is central to the health, well-being and livelihood of everyone on this planet. In the UK, the biggest risk to water quality is the ongoing lack of sampling, monitoring and reporting. The impact on both human health and the ecosystems that rely on them are still largely unobserved and unreported. Right now we have a monumental information gap that needs to be urgently filled, and that can be started through simple observations – something we can all do. 

If you don’t truly understand the problem, how can you solve it?”

To take part you can download their App from the Apple or Google store or you can complete their online form.

River Path Improvements

A welcome planning application is 22/01005/D for improving the part of the Yare Valley Walk from the present improved path near the Strawberry Field to the Flyover. At the flyover it will link with the recently completed Cringleford Meadow paths. This is to satisfy a condition laid upon Phase 2 of the McCarthy Stone development. The plans are at https://planning.norwich.gov.uk.

A lovely stretch of the river where path will be improved

The improvement will be along one of the prettiest stretches of the Yare Valley Walk where at times in the year marsh type flowers such as water lilies, loosestrife, marsh buttercups, etc. can be found. At present it looks less than at its best due to nettles and rampant willow herb which obscure the river in many places. In the past it has been a section that is muddy and difficult in times of bad weather, the improved surface should encourage walkers to keep to the path and to avoid trampling neighbouring vegetation. Please respond to the application by 29th August 2022 if you can see where improvements to the proposals might be made.

Time to respond to McCarthy Stone Phase 3 Planning Application!

It would have been nice to report the latest planning application for the McCarthy Stone development on Bluebell Road was a model of best practice development in an ecological sensitive area. Unfortunately the proposals in the application are far from such a model.

Foreground Phase 2 development, background (beyond fence) Phase 3 site

On a first look through the application, some concerns are:

Dwelling Density

The high dwelling density of the development and its design will have a serious visual impact on the landscape of the valley and will degrade environmental assets within and adjacent to the site. The high dwelling density should be reduced.

Policy R42 of the Greater Norwich Local Plan (GNLP) envisaged the number of dwellings for the whole of the Bartram’s Site as being “… in the region of 120 dwellings. This figure is based on an assumption that the site will be developed mainly at low densities to ensure that impact on the landscape is minimised”. The GNLP aim was to “minimise impact on the landscape of the Yare Valley and important views”, and for the development to “protect and enhance environmental assets within and adjacent to the site”.

McCarthy and Stone in their latest Phase 3 application are proposing to build 100 dwellings in Phase 3 alone. These will be added to those of Phase 1 (61) and Phase 2 (50) resulting in a total of 211, almost double the number of 120 envisaged in the GNLP. These high densities can be expected to have a detrimental effect on the environment, both visually and ecologically. The proposals breach seriously the dwelling density safeguard of the GNLP.

Location, size and design of Infiltration “Pond”

(N.B. “Pond” is something of a misnomer here, since for much of the time it can be expected to be dry. Basin might be a better name)

The Public Access green space that formed part of Phase 2, should not be degraded by a the insertion of a large infiltration basin. Any such basin should be incorporated within the original site area for phase 3.

While accepting that that an infiltration basin is necessary to reduce runoff into the river and limit flooding downstream, little attention seems to be given to reducing the basin size by a greater use of water permeable surfaces of drives, parking areas etc., and by use of rainwater harvesting within the site. Further reduction in runoff could be achieved by reducing the dwelling density, by retaining more of the existing vegetation, and by increasing the area of planted green space in the proposals. At the same time the site’s ecology would be improved.

Little indication is given of the design of the “Pond”. Properly designed infiltration basins can be made available for public access, and can be planted with trees, shrubs and other plants, improving their visual appearance and providing habitats for wildlife.

Many mature and semi-mature trees will be removed from the site

Ecological Gain

The UK biodiversity is generally acknowledged as being in catastrophic decline. More needs to be done on this site to enhance biodiversity and provide some “ecological gain”

McCarthy Stone’s own Ecological Report makes a number of recommendations for ecological enhancement. These include “Removal of existing trees on site should be avoided were possible” and “Removal of the existing hedgerows on the site should be avoided where possible and kept to a minimum if unavoidable” The proposals include the removal of most of the relatively mature trees and shrubs in contradiction of Ecological Report’s recommendations. The site tree survey suggests that many trees are not perfect specimens, but they are established, (important in drought conditions), and considerably more mature than any that are likely to be planted as part of the development.

Please take a critical look at and respond to the plans at https://planning.norwich.gov.uk, using application number 22/00298/F and selecting the Documents tab. The Layout Plan, Tree Survey and Ecological Report are good start points. Comment by 24th August 2022.

Your comment is essential if these proposals are to be improved.

Norwich City Council Biodiversity Strategy and Action Plan Consultation

Norwich City Council are “seeking your feedback and ideas to inform” their Biodiversity Strategy for 2022 to 2032 and their associated Biodiversity Action Plan.

A copy of the Strategy is available at https://gettalking.norwich.gov.uk/biodiversity-strategy The Yare Valley Green Infrastructure Corridor can be expected to play a key role in the strategy, linking as it does five of the eight Norwich local nature reserves. But there is also an opportunity to make suggestions as to how climate change and biodiversity decline can be tackled at a smaller scale. Your ideas can join the Big Biodiversity Conversation at https://gettalking.norwich.gov.uk/big-biodiversity-conversation.

The consultation ends on Wednesday 31st August.

Path upgrade for Cringleford Meadow

The path in Cringleford Meadow has long been muddy and difficult in times of bad weather. Both the path and the carpark are having their surfaces improved by laying compacted hardcore. The new all-weather path surface should make it easier to stay on the path and avoid trampling the vegetation in attempts to bypass the mud.

Present hard path end

The Meadow will be closed from Monday 16th May for 8 weeks. On site notices give the  diversion details. YVS understands the contractor will enable evening and weekend pedestrian access to the riverside path when and where safe to do so.

The full works comprise improvements to the path surface of the existing Yare Valley Walk alongside the river between Cringleford Meadow Car Park and the footbridge just north of the A11 flyover. The car park will also receive improvements with a gravel filled plastic grid system, similar to that at Danby Wood carpark, to regularise the surface and make the car park easier to use.

One of the alternative routes uses the not so widely known path alongside the flyover that was brought into being as part of the McCarthy and Stone development.

Eaton Eco Fair, Dawn Chorus Walk, Eco Trail, and Swaps

The Yare Valley Society will be at the

THE EATON SPRING ECO FAIR

at St Andrew’s Church and Church Hall in Church Lane, on Saturday 7 May 2022, 10 am to 12 noon.

The Society’s display will highlight the important roles played by the Yare Valley green corridor in combatting and mitigating the effects of climate change. The Society will by joined by organisations such as Norfolk County Council Waste Management, the local Allotment Association, Conservation Volunteers, and more. There will also be stalls run by local companies, shops and business outlets selling environmentally-friendly goods and supplies.

ECO TRAIL

An ECO TRAIL for children and families will be in the Church grounds.

DAWN CHORUS WALK     

EVRA (Eaton Village Residents’ Association) are inviting you to start the day with a dawn chorus walk  – meet Phil Atkinson at the gate to the Eaton marshes near the golf course at 6.30 am on 7 May.

SWAP EVENT

There’s also a “Swap” event at 5.30 pm in the Hall when you can update your wardrobe, library and toys.

The EVRA website has more details, and the event Flyer is here.

Can you help with a green space survey?

An economics student at the University of East Anglia, as part of her dissertation, is investigating the usage of greenspace and parks in Norwich and how these are related to health outcomes and attitudes of Norwich residents.

“There is considerable evidence that usage of and access to green spaces can significantly improve health outcomes in the population. However, throughout the UK, studies have shown that green space is unequally distributed. There is limited research investigating the actual usage of green spaces and how it varies across different urban areas. I hope to help investigate this with my dissertation and see how changes could be made to benefit the Norwich population.”

You can help by responding to her survey here. The survey has been approved by UEA ethics committee, it does not collect identifying information, and data responses will be stored securely online to meet GDPR and will be destroyed after the project is completed.

“A Wilder Norwich for All”

Sweet Briar Marshes Appeal

Norfolk Wildlife Trust has launched an appeal for funds to purchase and manage Sweet Briar Marshes (36.6 hectare) in the Wensum Valley green corridor. 

The Wensum green corridor, in common with the Yare Valley green corridor, is threatened by the surrounding urban development, and the purchase of the marshes by NWT would be a valuable contribution to safeguarding the future of the corridor. The Wensum joins the Yare  at Whitlingham.

“Close to the heart of Norwich lies Sweet Briar Marshes: 90 acres of fen, rough meadow, grazing marsh, old hedgerows and young woodland. This mosaic of habitats, unusually for a city centre, was arable farmland until as recently as the late 1990s, and today provides a treasure trove of nature, wildness and peace.

But this uniquely wild place is increasingly surrounded by urban development, and its sensitive ecology – including a Site of Special Scientific Interest (SSSI) – is in danger of being lost forever…

Today, with the chance to secure the land, restore its biodiversity, and enhance it for people and wildlife alike, we have the remarkable opportunity to rewrite the story of Sweet Briar Marshes.

We want to create A Wilder Norwich For All with Sweet Briar at its centre an urban green space that is both rich in wildlife and enriching to the lives of the communities it serves; accessible to and valued by all the species who share it.”

More about the appeal is here and there are also some FAQs. The appeal is for £600,000 and Aviva has offered to match £ for £ every donation up to £300,000.

 

McCarthy Stone  (Bluebell Road) Phase 3 Online Consultation

McCarthy Stone are carrying out a pre-planning application consultation for Phase 3 of their development on Bluebell Road. Unfortunately, the window for a response is very short, being barely a week, ending on Saturday 19th February.

The consultation is here.

Pre-application consultations are a valuable opportunity to influence the detail of an application prior to its submission. Once an application has been submitted for approval its details are more difficult to change.

Phase 1 of the development was for more than 60 residences which have already been occupied. Phase 2 of more than 40 residences already has planning approval, but has not yet been started. Phase 3 will be for over 100 residences in apartments and bungalows,  and should complete the development of the site. The Strawberry field has already been released as public green space, and more public green space will be released to the west of the residences as the development progresses. Marshland adjacent to the river will also be protected.

Please make a response to the application if you feel able. Some things you might think about with respect to the Valley are:

  • Protection of views from the Yare Valley including the Strawberry Field and other released green space. Some buildings are three storey.
  • Views from Bluebell Road through the development towards the valley.
  • Access to green space from the development and through the development from the Bluebell Road.
  • Layout and character of footpaths in green space.
  • How green space areas should be managed in the future.
  • Permeability of the development to wildlife
  • Is this density of housing and level of parking spaces appropriate for a development adjacent to the Yare Valley Green Infrastructure corridor?

Have a say on the Lasdun Wall

UEA are preparing a planning application for proposals to refurbish and extend part of the Lasdun Wall. The extension is in the vicinity of the Chancellors Lodge near where Chancellors Drive joins University Drive.

North west side of Lasdun Wall

The extension will be on the north west side of the wall, increasing the width of the wall.

A public pre-planning consultation will be held in the Foyer of the Enterprise Centre at the UEA on Wednesday 2nd February 3–7pm. The proposals are not expected to have a significant impact on the Valley green space, but the YVS committee will scrutinise them carefully.

The Enterprise Centre is the “straw” building on University Drive, opposite the Sportspark car park. 

If you are unable be there in person, the proposals, and an opportunity to comment, will be at www.uea-lasdunwall-phase1.co.uk from 2nd to the 18th  February.